Skip to main content

Cement Deep Mixing

 Deep Cement Mixing (DCM) is a soil improvement method where the in situ soil mixes with cement or other hardening agents such as (lime, slag, or other binders) at depths by augers. Deep mixing has been mostly used to improve soft cohesive soils, but sometimes it is used to reduce permeability and mitigate liquefaction of cohesionless soils.

The deep mixing method has the following advantages:
• Applicable for most soil types
• Installed at great depths
• Relatively fast installation
• Low noise and vibration level
• Formation of a DM wall for earth retaining and water barrier at the same location and time
• Less spoil soil, especially for the dry method


Comments

Popular posts from this blog

Statigrafi dua mega proyek Indonesia

Ini statigrafi dua mega proyek di Indonesia. Mungkin ada yang bisa bedakan. pada MRT ada istilah aluvium dan dualivium. Sedangkan yang bawah tidak ada hanya klasifikasi tanah. Juga saya sering temui soal pewarnaan yang tidak sesuai juga motif dari jenis tanah. Karena tanah memiliki simbol - simbol tergantung jenis tanahnya. Hanya untuk koreksi ke depannya.   

Arigato gozaimasu Patimban

This April is the last month I worked with Patimban. A lot memory happen from beginning it was a sea the continue to build couseway. Piling at couseway form one pier to ther pier, test pile PDA test and PIT and also start excavation.  Also don't forget to drilling test in bagan at sea.  In Patimban I meet 3 japanese people Atsutsi Kawamura, besso and Tishiko Nishio  1. Drilling at sea  Began in April 2021 and ended at June 2021. Firstly we place bagan at sea according the coordinate. then continue mobilize the drilling machine. A lot problem happen like like sea tide,  difficult to move drilling machine from one bagan to other bagan, machine broken and a lot more. From Abutment one to pier 24 about 1 km. 2. Ramp ON Ramp OFF We built a road in swampy area about 500 m from existing road which built with pile slab in Packet 4.  First install bamboo deep about 5 m then continue with matras bamboo then geotextile next embakment about 1 - 3 m.   3. PDA ...